<img height="1" width="1" style="display:none;" alt="" src="https://dc.ads.linkedin.com/collect/?pid=237593&amp;fmt=gif">

Why Coated Metal is Replacing FRP Duct on Wastewater Odor Control Systems

Learn how a revolutionary technology that has been proven by the semiconductor industry to safely handle process fume exhaust is being used by DC Blue Plains and Brightwater WWTP's to:

      • Improve foul air containment & corrosion resistance
      • Reduce construction costs & time to install
      • Improve worker and plant safety
      • Eliminate maintenance costs
      • Improve system adaptability